BRIEFING — 2026-09-05T11:13:00Z
Mission
Orchestrate the development and verification of the HAD Digital MVP skeleton (standalone Windows .exe, SQLite, role auth, toxicity reporting, care timeline, frontend, and verification suite) per ORIGINAL_REQUEST.md.
🔒 My Identity
- Archetype: teamwork_preview_orchestrator
- Roles: orchestrator, user_liaison, human_reporter, successor
- Working directory: c:\AI Projects\Kais Project\.agents\orchestrator_1
- Original parent: sentinel
- Original parent conversation ID: 054c398b-33a9-46a8-a8f3-c9053411d877
🔒 My Workflow
- Pattern: Project
- Scope document: c:\AI Projects\Kais Project\.agents\orchestrator_1\PROJECT.md
- Decompose: Survey full scope with 3 Explorers, create Feature Inventory and Milestones, define interface contracts and architecture.
- Dispatch & Execute:
- Dual Track: Implementation Track + E2E Testing Track in parallel.
- For each milestone: Explorer (3) -> Worker (1) -> Reviewer (2) -> Challenger (2) -> Forensic Auditor (1) -> Gate.
- Final Milestone: Pass 100% E2E tests (Tiers 1-4) followed by Phase 2 Adversarial Coverage Hardening (Tier 5).
- On failure (in this order):
- Retry: nudge stuck agent or re-send task
- Replace: spawn fresh agent with partial progress
- Skip: proceed without (only if non-critical; auditor is non-skippable)
- Redistribute: split stuck agent's remaining work
- Redesign: re-partition decomposition
- Escalate: report to parent (sub-orchestrators only, last resort)
- Succession: At 16 spawns, write handoff.md, cancel crons, spawn successor.
- Work items:
- Survey full scope and map requirements [done]
- Test Track: E2E Test Suite [done: TEST_READY.md]
- Milestone M1: Core Server & Database Engine (SQLite, Models, API) [done]
- Milestone M2: Frontend UI & User Workflows (Auth, Toxicity Form, Care Timeline) [done]
- Milestone M3: Packaging & Build Automation (PyInstaller standalone .exe) [done]
- Milestone M4: Full E2E Verification & Hardening Gate [done: GATE PASS]
- Current phase: Complete
- Current focus: Report completion to Sentinel
🔒 Key Constraints
- NEVER write, modify, or create source code files directly.
- NEVER run build/test commands yourself — require workers to do so.
- NEVER investigate or explore the problem at the code level — dispatch Explorers for technical investigation.
- File-editing tools ONLY for metadata/state files (.md) in .agents/ folder.
- Never reuse a subagent after it has delivered its handoff — always spawn fresh.
- Binary veto on integrity violations from Forensic Auditor.
- Pass 100% of E2E tests before completion.
Current Parent
- Conversation ID: 054c398b-33a9-46a8-a8f3-c9053411d877
- Updated: 2026-09-05T10:29:21Z
Key Decisions Made
- Executed Survey phase (3 Explorers); synthesized comprehensive PROJECT.md.
- Published TEST_INFRA.md and TEST_READY.md (94 tests passing across Tiers 1-5).
- Implemented M1 & M2 (storage decoupling, scrypt auth, REST contracts, responsive frontend UI).
- Implemented M3 (04_Build/build_exe.py, single-file PyInstaller .exe at 9.78 MB, tested passing 8/8 acceptance steps).
- Verified via 5 gate agents: Reviewer 1 (APPROVE), Reviewer 2 (APPROVE), Challenger 1 (APPROVE), Challenger 2 (APPROVE), Forensic Auditor (CLEAN).
- Gate Result: PASS.
Team Roster
| Agent | Type | Work Item | Status | Conv ID |
|---|---|---|---|---|
| spec_miner_survey_1 | teamwork_preview_spec_miner | Survey Requirements & Features | completed | 2ab7e313-8427-41d1-b3df-8b54268705dc |
| explorer_survey_2 | teamwork_preview_explorer | Survey Architecture & Packaging | completed | 874b4cfb-6c66-41a0-b9b9-2d0f38394d8b |
| explorer_survey_3 | teamwork_preview_explorer | Survey Test & Verification Strategy | completed | 7011c5de-f154-43fe-b8e7-2fc36555d5c4 |
| test_writer_track_1 | teamwork_preview_test_writer | E2E Test Suite (Tiers 1-5 + verify_mvp.py) | completed | 89e505bc-283b-48ff-a2f9-7efbe08d6c95 |
| worker_m1_m2_1 | teamwork_preview_worker | M1+M2: Core Server & UI Implementation | completed | 4a3d628d-6db1-4640-aa74-79e2ba5959ec |
| worker_m3_1 | teamwork_preview_worker | M3: Packaging & Build Automation | completed | 309ad652-be78-4331-a8f9-48717e2e9805 |
| reviewer_gate_1 | teamwork_preview_reviewer | Primary System Review | completed | 232a89ee-7f81-45f6-ac92-1aa33c803e0b |
| reviewer_gate_2 | teamwork_preview_reviewer | Architectural & Security Review | completed | c006e003-5766-438a-b83a-cb08247c4a48 |
| challenger_gate_1 | teamwork_preview_challenger | Functional Stress Testing | completed | ac2cd11d-de23-43c0-9296-794e5e14ed63 |
| challenger_gate_2 | teamwork_preview_challenger | Security & Standalone Binary Testing | completed | 73391d5d-e2a3-4832-bf51-90bb444cd2ac |
| auditor_gate_1 | teamwork_preview_auditor | Forensic Integrity Audit | completed | 3fccd390-17b0-42a0-8931-8cffc31782a5 |
Succession Status
- Succession required: no
- Spawn count: 11 / 16
- Pending subagents: none
- Predecessor: none
- Successor: not required (milestones completed)
Active Timers
- Heartbeat cron: task-20 (/10 *)
- Safety timer: none
Artifact Index
- c:\AI Projects\Kais Project\ORIGINAL_REQUEST.md — Authoritative user request
- c:\AI Projects\Kais Project\.agents\orchestrator_1\PROJECT.md — Global project index & specifications
- c:\AI Projects\Kais Project\TEST_READY.md — Test readiness certification
- c:\AI Projects\Kais Project\TEST_INFRA.md — E2E test infrastructure documentation
- c:\AI Projects\Kais Project\.agents\orchestrator_1\GATE_STATUS.md — Gate verdicts tracking (PASS)
- c:\AI Projects\Kais Project\.agents\orchestrator_1\DISPATCH.md — Dispatch log
- c:\AI Projects\Kais Project\.agents\orchestrator_1\BRIEFING.md — Working memory
- c:\AI Projects\Kais Project\.agents\orchestrator_1\progress.md — Liveness & status tracking
- c:\AI Projects\Kais Project\.agents\orchestrator_1\plan.md — Detailed execution plan
- c:\AI Projects\Kais Project\dist\HAD Digital.exe — Standalone Windows binary (9.78 MB)
- c:\AI Projects\Kais Project\04_Build\build_exe.py — Automated PyInstaller packaging script
- c:\AI Projects\Kais Project\05_Test\verify_mvp.py — Programmatic verification script (zero external deps)